TY - GEN
T1 - Análisis Prospectivo, AHP, Diagrama Causal Loop y Simulación Montecarlo para reducir costos de una empresa metalmecánica
AU - Tello, Aurorita
AU - Caruanambo, Gian Pierre
AU - Julcamoro, Junior
AU - Huancahuire, Leslie
AU - Tiznado, Walter
AU - Oblitas, Jimy
N1 - Publisher Copyright:
© 2024 Latin American and Caribbean Consortium of Engineering Institutions. All rights reserved.
PY - 2024
Y1 - 2024
N2 - The project focuses on addressing the current and future challenges of a metal-mechanical company. A prospective analysis and casual diagrams were performed to propose optimal solutions oriented toward continuous improvement. The goals established in this investigation were reorganizing the physical space to maximize efficiency, implementing a preventive maintenance plan for equipment, addressing the environmental impact of noise through acoustic insulation, improving inventory logistics management with ABC methodology, and using a Monte Carlo simulation for cost reduction. The discussion of results highlights the performance, such as improved operational efficiency and productivity with the new layout, reduced downtime with preventive maintenance, regulatory compliance and welfare generated by the acoustic insulation, and accuracy in inventory management with the ABC methodology. In conclusion, the implementation of these solutions has proven to be fundamental for the integral optimization of the company, effectively addressing the identified challenges.
AB - The project focuses on addressing the current and future challenges of a metal-mechanical company. A prospective analysis and casual diagrams were performed to propose optimal solutions oriented toward continuous improvement. The goals established in this investigation were reorganizing the physical space to maximize efficiency, implementing a preventive maintenance plan for equipment, addressing the environmental impact of noise through acoustic insulation, improving inventory logistics management with ABC methodology, and using a Monte Carlo simulation for cost reduction. The discussion of results highlights the performance, such as improved operational efficiency and productivity with the new layout, reduced downtime with preventive maintenance, regulatory compliance and welfare generated by the acoustic insulation, and accuracy in inventory management with the ABC methodology. In conclusion, the implementation of these solutions has proven to be fundamental for the integral optimization of the company, effectively addressing the identified challenges.
KW - ABC Monte Carlo
KW - Maintenance
KW - Saaty
KW - inventory
UR - http://www.scopus.com/inward/record.url?scp=85203813529&partnerID=8YFLogxK
U2 - 10.18687/LACCEI2024.1.1.271
DO - 10.18687/LACCEI2024.1.1.271
M3 - Contribución a la conferencia
AN - SCOPUS:85203813529
T3 - Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology
BT - Proceedings of the 22nd LACCEI International Multi-Conference for Engineering, Education and Technology
T2 - 22nd LACCEI International Multi-Conference for Engineering, Education and Technology, LACCEI 2024
Y2 - 17 July 2024 through 19 July 2024
ER -