TY - GEN
T1 - Diseño de un Sistema de Monitoreo y Control de Proyectos basado en la Técnica de Gestión del Valor Ganado para Mejorar la Gestión de Proyectos Institucionales en una entidad Microfinanciera de Trujillo, 2020
AU - Martínez, Paúl Quiñones
AU - Puyén, Rocio Capuñay
N1 - Publisher Copyright:
© 2021 Latin American and Caribbean Consortium of Engineering Institutions. All rights reserved.
PY - 2021
Y1 - 2021
N2 - The following article shows a purposeful research whose purpose was to show the feasibility of designing a basic monitoring and control system for the management of institutional projects in a microfinance institution in the city of Trujillo based on the earned value technique. Work was carried out taking as a reference the projects of the Institutional Operational Plan of the entity and analyzing one that met the established selection criteria. Likewise, the information collected was entered into the MS Excel software of the Office 365 suite and from this, results were obtained that showed pronounced or almost sustained delays during the execution of the project schedule (average SPI of 0.93) and, in addition, the project you are spending more than you have earned (average CPI of 0.95). These results, despite not being very encouraging, nevertheless make it possible to highlight the importance of having a monitoring and control system based on the earned value management indicators, since the information obtained here and if it had been available on time, would have made it possible to correct all or most of the deviations presented during the execution of the project, with which at the end of the execution of the project, a better result could have been obtained at a general level.
AB - The following article shows a purposeful research whose purpose was to show the feasibility of designing a basic monitoring and control system for the management of institutional projects in a microfinance institution in the city of Trujillo based on the earned value technique. Work was carried out taking as a reference the projects of the Institutional Operational Plan of the entity and analyzing one that met the established selection criteria. Likewise, the information collected was entered into the MS Excel software of the Office 365 suite and from this, results were obtained that showed pronounced or almost sustained delays during the execution of the project schedule (average SPI of 0.93) and, in addition, the project you are spending more than you have earned (average CPI of 0.95). These results, despite not being very encouraging, nevertheless make it possible to highlight the importance of having a monitoring and control system based on the earned value management indicators, since the information obtained here and if it had been available on time, would have made it possible to correct all or most of the deviations presented during the execution of the project, with which at the end of the execution of the project, a better result could have been obtained at a general level.
KW - Earned value management
KW - Monitoring and control system
KW - Project management
UR - http://www.scopus.com/inward/record.url?scp=85122026366&partnerID=8YFLogxK
U2 - 10.18687/LACCEI2021.1.1.216
DO - 10.18687/LACCEI2021.1.1.216
M3 - Contribución a la conferencia
AN - SCOPUS:85122026366
T3 - Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology
BT - 19th LACCEI International Multi-Conference for Engineering, Education Caribbean Conference for Engineering and Technology
A2 - Larrondo Petrie, Maria M.
A2 - Zapata Rivera, Luis Felipe
A2 - Aranzazu-Suescun, Catalina
T2 - 19th LACCEI International Multi-Conference for Engineering, Education Caribbean Conference for Engineering and Technology: "Prospective and Trends in Technology and Skills for Sustainable Social Development" and "Leveraging Emerging Technologies to Construct the Future", LACCEI 2021
Y2 - 19 July 2021 through 23 July 2021
ER -