T1 - Gestión de abastecimiento para los costos de operación de una empresa de infraestructuras
AU - Alfaro-Rosas, Jorge Luis
AU - Paredes, Jairo Valverde
N1 - Publisher Copyright:
© 2023 Latin American and Caribbean Consortium of Engineering Institutions. All rights reserved.
PY - 2023
Y1 - 2023
N2 - The objective of this research work was to design a supply management model for operating costs in an infrastructure company. The methodology has a mixed approach, non-experimental, cross-sectional design and a sample of 4 products. The techniques and instruments were: Observation (Observation Guide), Interview (Interview Guide) and Documentary Analysis (Summary Sheet), determining the validity and reliability, the judgment of experts in the logistic area was taken. Eight out of 20 root causes were prioritized: Delays in the delivery of suppliers, lack of follow-up of purchase orders, lack of purchasing policies, lack of purchasing planning, low purchasing budget, lack of personnel training, representing 57.29% of cost impact. Likewise, the improvements would be: ABC Method, Kraljic Matrix, Purchasing Procedure, Purchasing Operational Policies, Purchasing Budget, Approval and Evaluation of Suppliers, Training Plan minimizing cost overruns up to 60%. Finally, the company will eliminate profitability, reduce costs, with an investment of S/21,794.80.
AB - The objective of this research work was to design a supply management model for operating costs in an infrastructure company. The methodology has a mixed approach, non-experimental, cross-sectional design and a sample of 4 products. The techniques and instruments were: Observation (Observation Guide), Interview (Interview Guide) and Documentary Analysis (Summary Sheet), determining the validity and reliability, the judgment of experts in the logistic area was taken. Eight out of 20 root causes were prioritized: Delays in the delivery of suppliers, lack of follow-up of purchase orders, lack of purchasing policies, lack of purchasing planning, low purchasing budget, lack of personnel training, representing 57.29% of cost impact. Likewise, the improvements would be: ABC Method, Kraljic Matrix, Purchasing Procedure, Purchasing Operational Policies, Purchasing Budget, Approval and Evaluation of Suppliers, Training Plan minimizing cost overruns up to 60%. Finally, the company will eliminate profitability, reduce costs, with an investment of S/21,794.80.
KW - Cost Overruns
KW - Expert Judgment
KW - Homologation
KW - Kraljic Matrix
KW - Root Causes
UR - https://www.scopus.com/pages/publications/85172355457
M3 - Contribución a la conferencia
AN - SCOPUS:85172355457
T3 - Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology
BT - Proceedings of the 21st LACCEI International Multi-Conference for Engineering, Education and Technology
A2 - Larrondo Petrie, Maria M.
A2 - Texier, Jose
A2 - Matta, Rodolfo Andres Rivas
T2 - 21st LACCEI International Multi-Conference for Engineering, Education and Technology, LACCEI 2023
Y2 - 19 July 2023 through 21 July 2023
ER -