TY - GEN
T1 - Implementación de la Matriz de comparación de criterios para reducir costos en una empresa textil
AU - Rosillo, Erika Marisol Andrade
AU - Sebastian, Sara Dayeri Uscamayta
AU - Díaz, Marco Antonio Díaz
AU - Rabanal-Chavez, Erick Humberto
N1 - Publisher Copyright:
© 2023 Latin American and Caribbean Consortium of Engineering Institutions. All rights reserved.
PY - 2023
Y1 - 2023
N2 - This article aims to show the impact of the implementation of engineering tools in the mitigation of problems present in the production and logistics areas in a textile company located in the district of San Miguel (Lima-Peru); the problem being the high rate of materials refusal to suppliers; generating unscheduled shutdown due to lack of the main material causing an increase in the cost of production. Consequently, a need appears regarding the possible solutions for this problem. To meet this objective, the Criteria Comparison Matrix tool was proposed after a previous evaluation of realistic restrictions, historical data of the main and secondary suppliers was used for the design, the study was complemented with the linear regression simulation, resulting in a reduction in production costs of a total of S/160.00 per month. Finally, the economic viability of the implementation was evaluated, resulting in an IRR of 17%, a NPV of S/1,275.44, in addition to a B/C of 7.51.
AB - This article aims to show the impact of the implementation of engineering tools in the mitigation of problems present in the production and logistics areas in a textile company located in the district of San Miguel (Lima-Peru); the problem being the high rate of materials refusal to suppliers; generating unscheduled shutdown due to lack of the main material causing an increase in the cost of production. Consequently, a need appears regarding the possible solutions for this problem. To meet this objective, the Criteria Comparison Matrix tool was proposed after a previous evaluation of realistic restrictions, historical data of the main and secondary suppliers was used for the design, the study was complemented with the linear regression simulation, resulting in a reduction in production costs of a total of S/160.00 per month. Finally, the economic viability of the implementation was evaluated, resulting in an IRR of 17%, a NPV of S/1,275.44, in addition to a B/C of 7.51.
KW - AHP
KW - Criteria comparison matrix
KW - Production
KW - Warehouse
UR - http://www.scopus.com/inward/record.url?scp=85172296909&partnerID=8YFLogxK
M3 - Contribución a la conferencia
AN - SCOPUS:85172296909
T3 - Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology
BT - Proceedings of the 21st LACCEI International Multi-Conference for Engineering, Education and Technology
A2 - Larrondo Petrie, Maria M.
A2 - Texier, Jose
A2 - Matta, Rodolfo Andres Rivas
T2 - 21st LACCEI International Multi-Conference for Engineering, Education and Technology, LACCEI 2023
Y2 - 19 July 2023 through 21 July 2023
ER -