T1 - Influencia del PMBOK en la optimización de presupuestos en proyectos de infraestructura vial en Lima
AU - Neicer, Campos Vasquez
AU - Rubén Kevin, Manturano Chipana
AU - Jose Luis, Neyra Torres
AU - Jvan, Jovanovic Aguirre
AU - Abel, Carmona Arteaga
AU - Angela Giovana, Maza Chumpitaz
AU - Nilson Deonil, Campos Vasquez
N1 - Publisher Copyright:
© 2023 Latin American and Caribbean Consortium of Engineering Institutions. All rights reserved.
PY - 2023
Y1 - 2023
N2 - The general objective of this article is to find a cost control system that, using the PMBOK, can efficiently budget road infrastructure works in Lima 2022. In order to achieve the proposed objectives, firstly, the guidelines for the proposal of a cost control system using the PMBOK to budget road infrastructure works were identified, secondly, the monitoring and control processes that allow budget this type of works and, finally, a guide was determined, so that the cost control system is efficient to budget road infrastructure works in Lima. 2022. The expected results in this research reflected in a guide are translated into an estimated cost of construction of the project, in accordance with the national reality in force at the time of the review and the feasibility of its realization. The conclusions that were obtained were that there is a positive influence of the application of the PMBOK Guide in infrastructure works, reducing costs and optimizing the budgets of this type of works.
AB - The general objective of this article is to find a cost control system that, using the PMBOK, can efficiently budget road infrastructure works in Lima 2022. In order to achieve the proposed objectives, firstly, the guidelines for the proposal of a cost control system using the PMBOK to budget road infrastructure works were identified, secondly, the monitoring and control processes that allow budget this type of works and, finally, a guide was determined, so that the cost control system is efficient to budget road infrastructure works in Lima. 2022. The expected results in this research reflected in a guide are translated into an estimated cost of construction of the project, in accordance with the national reality in force at the time of the review and the feasibility of its realization. The conclusions that were obtained were that there is a positive influence of the application of the PMBOK Guide in infrastructure works, reducing costs and optimizing the budgets of this type of works.
KW - Management and Cost Management Plan
KW - PMBOK
KW - Road Infrastructure
UR - http://www.scopus.com/inward/record.url?scp=85172399237&partnerID=8YFLogxK
M3 - Contribución a la conferencia
AN - SCOPUS:85172399237
T3 - Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology
BT - Proceedings of the 21st LACCEI International Multi-Conference for Engineering, Education and Technology
A2 - Larrondo Petrie, Maria M.
A2 - Texier, Jose
A2 - Matta, Rodolfo Andres Rivas
T2 - 21st LACCEI International Multi-Conference for Engineering, Education and Technology, LACCEI 2023
Y2 - 19 July 2023 through 21 July 2023
ER -