N2 - The present investigation is based on the improvement in quality management to reduce costs in the company SERGECOR S.A.C, which presents a series of problems in its logistical, financial and sales process. The study used an analysis method. In the methodology; On the one hand, tools such as: Process Operations Diagram (PDO), Quality Function Deployment (QFD), Six Sigma and Failure Mode and Effect Analysis (FMEA) were used; On the other hand, for the statistical tests the Ishikawa, the Indicator Matrix, the Pareto diagram, the histograms and control charts developed in Minitab were used. A loss of S/. 26, 206.00 in the sum of the 4 root causes, identifying that Root Cause 1 "Lack of training of work personnel" and Root Cause 4 "Absence of a work environment with optimal space" are the ones with the greatest impact, followed by Cause Root 3 "there is no adequate control during the review to acquire raw material" and ending with Root Cause 2 "lack of maintenance of work machines". Finally, the application of the proposed quality tools and processes, manage to control the value processes of the company, and therefore reduce the respective losses of each problem.
AB - The present investigation is based on the improvement in quality management to reduce costs in the company SERGECOR S.A.C, which presents a series of problems in its logistical, financial and sales process. The study used an analysis method. In the methodology; On the one hand, tools such as: Process Operations Diagram (PDO), Quality Function Deployment (QFD), Six Sigma and Failure Mode and Effect Analysis (FMEA) were used; On the other hand, for the statistical tests the Ishikawa, the Indicator Matrix, the Pareto diagram, the histograms and control charts developed in Minitab were used. A loss of S/. 26, 206.00 in the sum of the 4 root causes, identifying that Root Cause 1 "Lack of training of work personnel" and Root Cause 4 "Absence of a work environment with optimal space" are the ones with the greatest impact, followed by Cause Root 3 "there is no adequate control during the review to acquire raw material" and ending with Root Cause 2 "lack of maintenance of work machines". Finally, the application of the proposed quality tools and processes, manage to control the value processes of the company, and therefore reduce the respective losses of each problem.
KW - Optimization
KW - losses
KW - root cause
KW - six sigma
UR - https://www.scopus.com/pages/publications/85187292482
U2 - 10.18687/LEIRD2023.1.1.391
DO - 10.18687/LEIRD2023.1.1.391
M3 - Contribución a la conferencia
AN - SCOPUS:85187292482
T3 - Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology
BT - Proceedings of the 3rd LACCEI International Multiconference on Entrepreneurship, Innovation and Regional Development
T2 - 3rd LACCEI International Multiconference on Entrepreneurship, Innovation and Regional Development, LEIRD 2023
Y2 - 4 December 2023 through 6 December 2023
ER -