TY - GEN
T1 - Propuesta de Análisis y Gestión del Área de Almacén Basada en Simulación Monte Carlo para Reducir Sobrecostos en Laboratorio Clínico, Trujillo 2023
AU - Reyes, Cinthia Yohanna Castillo
AU - Aguilar, Nilson Bacilio
AU - Adrianzén, Miguel Enrique Alcalá
N1 - Publisher Copyright:
© 2024 Latin American and Caribbean Consortium of Engineering Institutions. All rights reserved.
PY - 2024
Y1 - 2024
N2 - The objective of research in the clinical laboratory company in Trujillo was to reduce cost overruns in the diagnosis and prevention of patients' diseases; In recent years, high cost overruns have been determined in the clinical analysis and warehouse processes. Before the proposal, activities that do not add value were observed, such as delays due to equipment stoppages, delays due to lack of stock in the warehouse, delays due to records of inputs that were not updated, delays due to searching for materials and supplies, an extra cost of S/ 52,436 for years. After analyzing and determining the root causes, the management proposal was based on the use of Monte Carlo simulation, TPM, MRP and time study. The proposal was reduced to S/ 27,049 per year. It was concluded that Monte Carlo simulation to predict the probability of different outcomes was useful given the difficulties of other approaches in preventive maintenance.
AB - The objective of research in the clinical laboratory company in Trujillo was to reduce cost overruns in the diagnosis and prevention of patients' diseases; In recent years, high cost overruns have been determined in the clinical analysis and warehouse processes. Before the proposal, activities that do not add value were observed, such as delays due to equipment stoppages, delays due to lack of stock in the warehouse, delays due to records of inputs that were not updated, delays due to searching for materials and supplies, an extra cost of S/ 52,436 for years. After analyzing and determining the root causes, the management proposal was based on the use of Monte Carlo simulation, TPM, MRP and time study. The proposal was reduced to S/ 27,049 per year. It was concluded that Monte Carlo simulation to predict the probability of different outcomes was useful given the difficulties of other approaches in preventive maintenance.
KW - delays
KW - disorder
KW - equipment stoppages
KW - lack of stock
KW - Monte Carlo Simulation
UR - http://www.scopus.com/inward/record.url?scp=85217219870&partnerID=8YFLogxK
U2 - 10.18687/LEIRD2024.1.1.537
DO - 10.18687/LEIRD2024.1.1.537
M3 - Contribución a la conferencia
AN - SCOPUS:85217219870
T3 - Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology
BT - Proceedings of the 4th LACCEI International Multiconference on Entrepreneurship, Innovation and Regional Development
A2 - Larrondo Petrie, Maria M.
A2 - Texier, Jose
A2 - Matta, Rodolfo Andres Rivas
T2 - 4th LACCEI International Multiconference on Entrepreneurship, Innovation and Regional Development, LEIRD 2024
Y2 - 2 December 2024 through 4 December 2024
ER -