T1 - Diseño e Implementación de un Plan de Requerimiento de Materiales y un Plan de Mantenimiento Productivo Total para reducir costos en una empresa de medicina estética y regenerativa, Trujillo-2023
AU - Bonifaz Beltrán, Luis Esteban
AU - De La Cruz Julón, Kasey Alliyah
AU - Castillo Cabrera, Rafael Luis Alberto
N1 - Publisher Copyright:
© 2023 Latin American and Caribbean Consortium of Engineering Institutions. All rights reserved.
PY - 2023
Y1 - 2023
N2 - The present work was elaborated with the purpose of implementing different process engineering tools in the modern regenerative medicine company in the city of Trujillo, Peru. The work included an initial diagnostic stage, where different problems were identified, such as incorrect planning for the requirement of medical supplies and deficient maintenance plan for machines. For the solution of these problems, two alternative solutions were proposed for each problem, which were evaluated with 6 concrete restrictions and the most optimal and appropriate one was selected, to determine which tools are best suited to the current context of the company. The tools implemented were Material Requirements Planning (MRP) and Total Productive Maintenance (TPM), and the results were compared with appropriate engineering standards to determine their impact. Finally, an annual cost reduction of S/1692.24 was obtained and at the same time the impact of the implementation of these tools was evaluated, obtaining an IRR of %54, an NPV of S/24, 928.02 and a B/C of 5.5.
AB - The present work was elaborated with the purpose of implementing different process engineering tools in the modern regenerative medicine company in the city of Trujillo, Peru. The work included an initial diagnostic stage, where different problems were identified, such as incorrect planning for the requirement of medical supplies and deficient maintenance plan for machines. For the solution of these problems, two alternative solutions were proposed for each problem, which were evaluated with 6 concrete restrictions and the most optimal and appropriate one was selected, to determine which tools are best suited to the current context of the company. The tools implemented were Material Requirements Planning (MRP) and Total Productive Maintenance (TPM), and the results were compared with appropriate engineering standards to determine their impact. Finally, an annual cost reduction of S/1692.24 was obtained and at the same time the impact of the implementation of these tools was evaluated, obtaining an IRR of %54, an NPV of S/24, 928.02 and a B/C of 5.5.
KW - Implementation
KW - MRP
KW - Maintenance
KW - Regenerative Medicine
KW - TPM
UR - https://www.scopus.com/pages/publications/85187299825
U2 - 10.18687/LEIRD2023.1.1.188
DO - 10.18687/LEIRD2023.1.1.188
M3 - Contribución a la conferencia
AN - SCOPUS:85187299825
T3 - Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology
BT - Proceedings of the 3rd LACCEI International Multiconference on Entrepreneurship, Innovation and Regional Development
T2 - 3rd LACCEI International Multiconference on Entrepreneurship, Innovation and Regional Development, LEIRD 2023
Y2 - 4 December 2023 through 6 December 2023
ER -