Influencia del PMBOK en la optimización de presupuestos en proyectos de infraestructura vial en Lima

  • Universidad Privada del Norte
  • Universidad Nacional de Trujillo

Producción científica: Capítulo del libro/informe/acta de congresoContribución a la conferenciarevisión exhaustiva

1 Cita (Scopus)

Resumen

The general objective of this article is to find a cost control system that, using the PMBOK, can efficiently budget road infrastructure works in Lima 2022. In order to achieve the proposed objectives, firstly, the guidelines for the proposal of a cost control system using the PMBOK to budget road infrastructure works were identified, secondly, the monitoring and control processes that allow budget this type of works and, finally, a guide was determined, so that the cost control system is efficient to budget road infrastructure works in Lima. 2022. The expected results in this research reflected in a guide are translated into an estimated cost of construction of the project, in accordance with the national reality in force at the time of the review and the feasibility of its realization. The conclusions that were obtained were that there is a positive influence of the application of the PMBOK Guide in infrastructure works, reducing costs and optimizing the budgets of this type of works.

Título traducido de la contribuciónInfluence of the PMBOK in the optimization of budgets in road infrastructure projects in Lima
Idioma originalEspañol
Título de la publicación alojadaProceedings of the 21st LACCEI International Multi-Conference for Engineering, Education and Technology
Subtítulo de la publicación alojadaLeadership in Education and Innovation in Engineering in the Framework of Global Transformations: Integration and Alliances for Integral Development, LACCEI 2023
EditoresMaria M. Larrondo Petrie, Jose Texier, Rodolfo Andres Rivas Matta
ISBN (versión digital)9786289520743
EstadoPublicada - 2023
Evento21st LACCEI International Multi-Conference for Engineering, Education and Technology, LACCEI 2023 - Buenos Aires, Argentina
Duración: 19 jul. 202321 jul. 2023

Serie de la publicación

NombreProceedings of the LACCEI international Multi-conference for Engineering, Education and Technology
Volumen2023-July
ISSN (versión digital)2414-6390

Conferencia

Conferencia21st LACCEI International Multi-Conference for Engineering, Education and Technology, LACCEI 2023
País/TerritorioArgentina
CiudadBuenos Aires
Período19/07/2321/07/23

Palabras clave

  • Management and Cost Management Plan
  • PMBOK
  • Road Infrastructure